Check the title. This was K’s first statement when she arrived on site today. In fact it was the first time she had been by to visit since the boys starting putting up panels. A busy week at work, combined with entertaining our daughter, L, combined with the darkest time of the year meant she hadn’t had a chance to check things out.

As usual, K is right. It DOES feel “housey.”

Things look unbelieveable. Really. I mean it. I can’t believe how well everything is coming together. The crew is doing a phenomenal job. The framers are flying, Matt has been out a few times a day to offer suggestions and check on things, Misha is cranking away on the retaining walls, and we now have a septic field.

And the SIPs panels have been perfect. Yes, assembly is slower because of the conditions, but every cut, every beam pocket and every connection has gone as hoped.

To say things are slower though is relative. We started putting up panels in earnest on Tuesday. By Friday afternoon the wall panels were complete, and 6 beams had been placed. So we now have walls, including the framing, insulation, wiring chases and interior/exterior sheathing. Nice, and pretty impressive.

All in all, it’s been a week of big progress.

Again, I can’t believe how amazing things look. It’s so beautiful, the scale of the house is incredible, and for the first time, we can truly see and feel the relationship between the land, the house and the retaining walls.

I’ll post better pictures this weekend, but in the mean time, here are a few to at least get you up to speed.